Dual Runway Operations

From 1st April - 31st October 2026 (All times local)

Monday - Friday 0615 - 2000 hrs

Saturday 0615 - 1600 hrs

Sunday 0615 - 0930 hrs and 1300 - 2000 hrs

The above times may be extended on a tactical basis through agreement between the ATC Watch Manager and Airfield Operations Duty Manager

At other times, Runway 05L / 23R will operate as a single runway

******************************************** -

Scheduled Maintenance - Runway 05L / 23R

Below are the scheduled closure times for Runway 05L / 23R for maintenance in 2026. Manchester Airport will operate single runway operations on Runway 05R / 23L during these times.